The 414-megawatt San Gabriel gas-fired power plant of First Gen Corporation has been synchronized back to the grid this week, following a five-month shutdown due to the technical glitch it suffered from since five months ago. In a disclosure to the Philippine Stock Exchange (PSE), the Lopez firm...